Does every EV charging installation require this report?
If the installation requires a BC Hydro service upgrade or a new secondary transformer, yes. Buildings with spare capacity occasionally get through on a standard permit application. We review the existing service during the scoping call and tell you which path applies before you pay for anything.
Can we stage the report for Phase 1 chargers now and Phase 2 later?
Yes, and this is usually the right call. We model the full build-out capacity in the report so the service upgrade is sized once for the long-term plan, not twice. Phase 2 then installs without another BC Hydro application.
How long does BC Hydro take to review a completed application?
Typically 6 to 12 weeks from the date a complete application is submitted. Incomplete submissions restart the clock. A well-prepared report, formatted to BC Hydro's technical standards, reduces back-and-forth significantly.
Our building is switching from gas to heat pumps. Do we need a report for every unit?
No. One building-wide report covers the full electrification scope. We model the aggregate demand increase across all units being converted and size the service upgrade accordingly.
What existing documents do you need from the strata?
The most useful starting point is the existing electrical single-line diagram, recent utility bills showing peak demand, and any BC Hydro correspondence already on file. We can work with less, some buildings have none of this, but these documents speed the assessment up.
Can you handle the BC Hydro application on our behalf?
We prepare the technical documentation and coordinate with BC Hydro's technical review team. The formal application is submitted through the strata's BC Hydro account, but we handle the engineering correspondence throughout.