Helping your building plan ahead with electrical planning reports.

BC Hydro requires a sealed electrical planning report before approving capacity upgrades for EV charging, heat pump conversion, or increased service. We prepare the report, coordinate the submission, and get your application moving.

Multi-family strata tower in British Columbia that Strata Engineering has prepared an electrical planning report for Multi-family strata building in British Columbia whose electrical service Strata Engineering has assessed for a planning report Multi-family strata building Strata Engineering has prepared an electrical planning report for
BC Hydro compliant, EGBC sealed, five-discipline engineering team
BC Hydro compliant EV charging infrastructure Heat pump & electrification Load flow analysis 100A - 400A+ service EGBC member firm 2M general liability Reporting since 2012 BC Hydro compliant EV charging infrastructure Heat pump & electrification Load flow analysis 100A - 400A+ service EGBC member firm 2M general liability Reporting since 2012

Three questions, one EGBC-sealed answer.

The Strata Property Act does not mandate this report. BC Hydro does. Any application that adds demand to the building's service connection triggers the same set of questions. We answer them in one document.

01

Can we install EV charging without a service upgrade?

The most common question in BC right now. Whether the strata wants two Level 2 stalls or two hundred, BC Hydro needs a report that models the incremental load and shows the upgrade path for the building's service. We model peak demand from the proposed charger count, factor in managed-load controls, and deliver a sealed report that moves BC Hydro's review from months to weeks.

02

Will the building support heat pump electrification?

Strata corporations switching from gas boilers or in-suite gas furnaces to heat pumps add significant electrical load per unit. BC Hydro will not approve the service upgrade without a report showing the full building load after electrification.

03

Are we already at capacity for the next ten years?

Aging buildings often hit capacity before EV or heat pump conversations start. New commercial tenants, upgraded common area lighting, or parkade ventilation redesigns can each push a building past its existing service limit and trigger the same requirement.

The report follows the current.

From BC Hydro's point of supply, up the main service riser, out to every load the building runs today and every one the council wants to add. Six parts make up the document. The report is an engineering record, not a cost estimate.

  • Existing service assessment: available capacity, panel condition, and meter base
  • Demand load calculations for the proposed additions, sized to BC Hydro's method
  • Load flow analysis traced across the distribution system back to BC Hydro's point of supply
  • Service upgrade options: 100A, 200A, or 400A+ recommendations with a staging plan
  • Managed-load analysis for EV infrastructure that reduces the upgrade scope where possible
  • EGBC-sealed report formatted for BC Hydro and permit submission, with full coordination

What the upgrade path actually looks like.

Most strata buildings in BC were built at 100A or 200A service. EV charging and heat pump electrification typically need a 200A or 400A upgrade. We find the path that costs less than the maximum.

100A

Existing pre-1990 service

Common in older low-rise buildings, with little headroom left for new load.

200A

Standard upgrade

Suits two to twenty EV stalls, or a first phase of heat pump conversion.

400A+

Full build-out

Fifty or more stalls, or whole-building electrification across every unit.

Multi-family residential building Strata Engineering has reported on
Fig. 02 Service upgrade report filed, BC-wide

How the report gets done.

Multi-family strata building whose electrical service Strata Engineering has assessed for a planning report How we work
01/ 04
Step 01

Scoping call

We learn the building, the proposed additions, and what BC Hydro application is already in flight. Existing drawings and utility bills go a long way. We confirm scope before the proposal is sent.

Step 02

Site assessment

Our electrical engineer inspects the main service entrance, metering, distribution panels, and any existing branch circuits relevant to the proposed scope. We photograph, measure, and log.

Step 03

Load calculations and report

Demand load analysis for the proposed additions, load flow through the distribution system, upgrade path options and costs. Report formatted to BC Hydro's submission requirements.

Step 04

Sealed delivery and submission

EGBC-sealed report delivered to your council. We coordinate with your BC Hydro representative on submission and respond to any technical review questions that come back.

Fig. 01

An electrical report that accounts for everything already running in your building.

Strata Engineering does electrical planning alongside the mechanical and building science disciplines that share the same electrical budget. We flag the interactions before BC Hydro finds them, and we size the upgrade once instead of twice.

BC Hydro requires a sealed electrical planning report before approving capacity upgrades for EV charging, heat pump conversion, or increased service.
BC Hydro application requirement

Booked by referral, manager to manager.

"The team at Strata Engineering have worked tirelessly on a number of projects I've assigned to them to deliver the best possible results. Their knowledge and professionalism have encouraged me to refer them to my peers and use them regularly."
Anders BeiermiesterProperty Manager
"I have always trusted Strata Engineering to handle the engineering needs of my portfolio; everything from general questions to major projects. I highly recommend them to anyone who wants confident solutions to their needs."
Charlotte LeungProperty Manager
"Strata Engineering has always gone above and beyond when I have engaged their services. They are both accommodating to client schedules and leave no question unanswered, leaving me and my strata with peace of mind."
Megan GossProperty Manager

Questions from the first call.

If yours is not here, ask us. We answer on the phone before anyone sends a proposal.

Does every EV charging installation require this report?

If the installation requires a BC Hydro service upgrade or a new secondary transformer, yes. Buildings with spare capacity occasionally get through on a standard permit application. We review the existing service during the scoping call and tell you which path applies before you pay for anything.

Can we stage the report for Phase 1 chargers now and Phase 2 later?

Yes, and this is usually the right call. We model the full build-out capacity in the report so the service upgrade is sized once for the long-term plan, not twice. Phase 2 then installs without another BC Hydro application.

How long does BC Hydro take to review a completed application?

Typically 6 to 12 weeks from the date a complete application is submitted. Incomplete submissions restart the clock. A well-prepared report, formatted to BC Hydro's technical standards, reduces back-and-forth significantly.

Our building is switching from gas to heat pumps. Do we need a report for every unit?

No. One building-wide report covers the full electrification scope. We model the aggregate demand increase across all units being converted and size the service upgrade accordingly.

What existing documents do you need from the strata?

The most useful starting point is the existing electrical single-line diagram, recent utility bills showing peak demand, and any BC Hydro correspondence already on file. We can work with less, some buildings have none of this, but these documents speed the assessment up.

Can you handle the BC Hydro application on our behalf?

We prepare the technical documentation and coordinate with BC Hydro's technical review team. The formal application is submitted through the strata's BC Hydro account, but we handle the engineering correspondence throughout.

BC Hydro won't approve the upgrade without this report.

Start with a twenty-minute scoping call. We review the existing service, confirm whether a report is required, and return a clear proposal before anyone commits to anything.