What makes a project "major" in scope?
We use the term for projects that touch more than one building system at once, envelope and structural, or mechanical and electrical, or all four together. A single-trade repair is typically straightforward to tender. Projects that cross disciplines need coordinated drawings, a shared schedule, and a single design authority to keep contractors aligned. That is where a firm like ours adds the most value.
Why use one firm instead of separate consultants for each discipline?
When each discipline has its own consultant, coordination falls to the property manager. Schedules conflict, drawings contradict each other, and the council cannot get a straight answer on the whole project. When one firm holds all the engineering, a single project manager carries the coordination load, the schedule is unified, and your council has one person to call.
What does the dedicated project manager actually do?
The project manager is non-technical, which means their entire focus is on contractor coordination, budget discipline, and keeping the council informed. They run the tender, manage site meetings, track progress against the schedule, and handle handover documentation. The engineers stay focused on engineering; the PM stays focused on keeping the project on track.
How does Strata Engineering handle contractor selection on a major project?
We run a structured tender process using the engineering drawings we produce. Because we write the scope, we can evaluate bids against a consistent standard. We give the council the information they need to choose a contractor, with the basis for each bid laid out, and they make the call.
Can you work alongside an existing contractor the strata already uses?
Yes. If the council has an established contractor relationship, we can scope and design the work so it can be tendered to that contractor, or run an open tender alongside them. We do not require exclusivity with any trade.
What does the council receive at handover?
At the end of a major project, we deliver a complete set of sealed drawings, site inspection reports, any test results or commissioning records, and a summary the council can use to update the depreciation report. Everything is organized so the next property manager, engineer, or lender who looks at the file can follow the project history.